Project Development & Execution

Land & Infrastructure Advisory

Site identification and selection, land acquisition assistance, land-use conversion, industrial park and SEZ facilitation, and utility infrastructure planning.

Request a proposalLifecycle stage: Plan

The problem

What goes wrong without this.

Site selection is the least reversible decision in an industrial project. Equipment can be replaced and processes can be re-engineered, but a plant cannot be moved once it is built, and the site determines logistics cost, labour availability, utility cost and regulatory exposure for the life of the asset.

The decision is frequently made on the wrong criteria — land price per acre, or proximity to the promoter's existing operations. What actually drives project economics is whether adequate power can be brought to the site, whether the water source is reliable and legally available, whether the land use permits industrial activity, whether effluent can be lawfully discharged, and whether the title will survive lender scrutiny.

Title and land-use problems are particularly costly because they surface late — usually during lender due diligence or subsidy application, after significant money has been spent.

What we do

Capabilities in this service

  • Site identification and comparative evaluation against technical, logistical and regulatory criteria
  • Industrial park, estate and SEZ plot facilitation with state industrial development corporations
  • Land acquisition assistance including negotiation and transaction support
  • Title verification coordination and land document due diligence with legal professionals
  • Land-use conversion and non-agricultural permission applications
  • Zoning, master plan and building bye-law compliance assessment
  • Utility infrastructure planning — power load assessment and sanction, water source and allocation
  • Effluent discharge route planning and pollution control siting requirements
  • Access, road, rail and port connectivity assessment for inbound and outbound logistics
  • Site development planning including levelling, drainage, boundary and internal infrastructure

Our process

How the engagement runs

Stage-wise, with the deliverable and typical duration for each. Timelines vary with project scale and authority response — these are indicative rather than contractual.

  1. 1

    Requirement definition

    1 week

    Land area including expansion provision, power and water load, effluent volume and character, logistics profile, workforce requirement and any process-specific siting constraints.

    Deliverable: Site requirement specification

  2. 2

    Location screening

    2–3 weeks

    Candidate locations and states compared on utility availability and cost, logistics, labour, incentive regime and regulatory environment — before individual plots are considered.

    Deliverable: Location comparison report

  3. 3

    Site identification

    3–6 weeks

    Specific plots identified within the selected locations, including industrial estate allotments and private land, with physical site inspection.

    Deliverable: Shortlisted sites with inspection notes

  4. 4

    Site due diligence

    3–5 weeks

    Title chain, encumbrances, land use classification, zoning, actual utility availability at the site boundary, and any environmental or statutory constraint on the parcel.

    Deliverable: Site due diligence report

  5. 5

    Acquisition and conversion

    2–6 months

    Transaction support through negotiation and registration, followed by land-use conversion, non-agricultural permission and plan approvals as applicable.

    Deliverable: Executed acquisition and converted land use

  6. 6

    Infrastructure planning

    2–4 months

    Power sanction application, water allocation, approach road, site development plan and internal infrastructure layout coordinated with plant layout.

    Deliverable: Utility sanctions and site development plan

Deliverables

What you receive

  • Site requirement specification
  • Location and site comparison report with scored evaluation
  • Site due diligence report covering title, land use and utilities
  • Acquisition transaction support and documentation
  • Land-use conversion and non-agricultural permissions
  • Power and water sanction applications and approvals
  • Site development and infrastructure layout plan

Who this is for

Typical client profiles

Promoters selecting a site for a new industrial facility
Foreign investors comparing Indian states and industrial locations
Companies needing land-use conversion or regularisation of an existing parcel
Businesses seeking allotment in an industrial estate, park or SEZ

Part of

Project Development & Execution

From drawing to commissioning.

Why NITS Corp

Why bring this to us

Sites evaluated on utilities, not on price per acre

Power availability at the boundary, lawful water source and a viable effluent route determine whether a site works. Cheap land without them is the most expensive option available.

Incentive regime factored into location choice

State industrial policy, district classification and park-specific benefits can move project economics materially. That comparison belongs at site selection, not after.

Due diligence before commitment

Title, land use and zoning are verified before money moves. These are the issues that surface during lender appraisal and stop projects that are otherwise ready.

FAQ

Common questions

Do you verify land title yourselves?
Title verification and legal opinion are rendered through qualified legal professionals — we coordinate that work and integrate its findings into the overall site assessment. Our own scope covers land use, zoning, utility availability, physical suitability and the commercial evaluation.
Can you help get a plot in an industrial estate?
Yes. We handle allotment applications with state industrial development corporations and park authorities, including the project profile and documentation these bodies require, and follow through the allotment process.
How long does land-use conversion take?
It varies widely by state and by the classification involved. Non-agricultural conversion is commonly two to six months where the parcel is straightforward. Where the master plan zoning itself needs amendment, it can take considerably longer, and we would normally advise against relying on that route.
Which state should we set up in?
It depends on your logistics profile, power and water intensity, labour requirement and which incentive schemes you qualify for. We run this as a structured comparison rather than a recommendation from general reputation, because the right answer differs substantially by sector.

Discuss your land & infrastructure requirement.

A short conversation is usually enough to tell you whether the project is viable, what it will take, and what it should cost. There is no charge for that first discussion.